Technology readiness levels
Every Open Space HDL project states its technology readiness level (TRL), so that verification results in simulation are not mistaken for hardware validation or flight heritage.
Where the projects stand
| Project | Level | Status |
|---|---|---|
| OpenWire ECSS-E-ST-50-12C Rev.1 |
TRL3
|
Fully verified by simulation. Not yet tested on hardware, no flight heritage. |
| OpenFibre ECSS-E-ST-50-11C |
TRL3
|
Fully verified by simulation. Not yet tested on hardware, no flight heritage. |
| OpenRMAP ECSS-E-ST-50-52C |
TRL3
|
Fully verified by simulation. Not yet tested on hardware, no flight heritage. |
| OpenSPP CCSDS 133.0-B-2 |
TRL3
|
Fully verified by simulation. Not yet tested on hardware, no flight heritage. |
| OpenCAN ECSS-E-ST-50-15C |
TRL3
|
Fully verified by simulation. Not yet tested on hardware, no flight heritage. |
| OpenCompact CCSDS 123.0-B-2 |
TRL3
|
Fully verified by simulation. Not yet tested on hardware, no flight heritage. |
| OpenCrypto CCSDS 352.0-B-2 |
TRL3
|
Fully verified by simulation. Not yet tested on hardware, no flight heritage. |
| OpenISP Region of interest · 2D window filters · Binning · Pixel replacement |
TRL3
|
Fully verified by simulation. Not yet tested on hardware, no flight heritage. |
| OpenDMA AXI4 · AXI4-Stream · Scatter/Gather |
TRL3
|
Fully verified by simulation. Not yet tested on hardware, no flight heritage. |
| Open Logic FT ECC · TMR · Safe FSMs |
TRL3
|
Fully verified by simulation. Not yet tested on hardware, no flight heritage. |
The roadmap of each project lists the steps to the next level; the family roadmap shows what comes next for the family as a whole.
What the levels mean for our IP cores
The levels are those of ISO 16290, adopted by ECSS as ECSS-E-AS-11C. The ECSS handbook ECSS-E-HB-11A explains how to apply them; for components such as IP cores, its Annex B (Table B-1) lists the milestones of every level, and ESA uses this table for IP cores as well. Our IP cores are VHDL soft IP for FPGAs: properties of the device such as the package, the temperature range, total ionising dose (TID) and single-event latch-up (SEL) are covered by the qualification of the target FPGA, and the IP core has to show that it works on that device. This gives the following meaning for each level:
| Level | Meaning for an IP core | Evidence |
|---|---|---|
| Specification and simulation | ||
| 1 | Basic functions defined: the standard and the scope of the implementation are identified. |
|
| 2 | In development: first modules simulated, first performance estimates. |
|
| 3 |
The IP core is fully verified by simulation, including its failure modes.
Today OpenWire OpenFibre OpenRMAP OpenSPP OpenCAN OpenCompact OpenCrypto OpenISP OpenDMA Open Logic FT |
|
| Hardware and radiation tests | ||
| 4 | Synthesized and implemented with timing closure on a representative FPGA as part of a reference system of the family, and tested on hardware in the laboratory against its functional and performance requirements, ideally with an independent link partner. The hardware test report of the system states which functions of each contained core were exercised. |
|
| 5 | Running on the radiation-tolerant target FPGA; a single-event effects (SEE) test, such as a heavy-ion or proton beam test with the IP core in operation, confirms the effectiveness of its mitigation (ECC, TMR, safe state machines) and quantifies the error rates. Operation over the temperature range is demonstrated. |
|
| Representative unit | ||
| 6 | Integrated in a representative unit (engineering model) with its real link partners and validated in the intended application environment; released with frozen requirements. |
|
| Qualification and flight | ||
| 7 | Part of an FPGA design qualified according to ECSS-E-ST-20-40 and ECSS-Q-ST-60-02 in a qualified unit, including radiation hardness assurance. |
|
| 8 | Part of a flight model that has passed acceptance and meets the mission requirements. |
|
| 9 | Flight proven: typically two years of nominal operation in orbit. |
|
Sources
- ISO 16290:2013, Space systems: Definition of the technology readiness levels (TRLs) and their criteria of assessment, adopted as ECSS-E-AS-11C (1 October 2014)
- ECSS-E-HB-11A, Technology readiness level (TRL) guidelines (1 March 2017): clause 5.3 and Annex B, Table B-1
- ESA, IPs TRL levels (ECSS-E-HB-11A)